OVERVIEW
Saudi Aramco's integrated refinery, IGCC power plant (up to 3.8 GW) and marine terminal complex at Jizan Economic City on the Red Sea. Designed crude capacity is about 400,000 b/d, producing gasoline, ultra-low-sulfur diesel, benzene and paraxylene. ★ Currently NOT operating: a Houthi strike on 27 July 2026 sparked a fire that halted operations during the 2026 Gulf conflict; as of this entry's verification date (23 Aug 2026), Aramco has delayed the restart target to 30 August 2026 (see news for latest status).
SPECIFICATIONS
Fields not shown are left blank because no verified public source was available — we do not fill them with estimates.
NEWS & HISTORY
Hydrocarbon Processing
Tech Times
VERIFICATION
Source: Oil & Gas Process Engineering
Last verified: 2026-08-23
This entry is based solely on the public source above. If anything is inaccurate, tell us — we verify, update and refresh the date.
See what other registries say about this company →TRADE WITH LIVERSE
Working a deal in this region or product group? Send volume, spec and delivery terms — our trade desk will reply.
Make a trade inquiry